Table Formwork and Flying Forms Explained: Crane-Lifted Deck Systems for Repetitive Slabs

Guides/Formwork

Table Formwork and Flying Forms Explained: Crane-Lifted Deck Systems for Repetitive Slabs

What table formwork and flying forms are, how crane-lifted slab decks work, how they compare with conventional and tunnel systems, and where plywood sits.

Crane lifting a pre-assembled plywood table form out from the edge of a concrete floor slab on a multi-storey building site

Table formwork is a prefabricated slab deck. It is assembled as one unit, lifted by crane and reused from floor to floor. A flying form is a table that is designed for crane transfer past the edge of the building. On a multi-storey frame where every floor repeats the one below, this approach removes much of the carpentry that a conventional deck needs for each pour.

The Vietnam Plywood Atlas is published by Vinawood with a transparent mill affiliation. This page is the educational companion to the mill's notes on slab formwork plywood and formwork plywood design basics. It explains how table systems work and where the plywood face fits. It does not list products.

Why repetitive floors changed the deck

A conventional slab deck is built in place. The crew erects props, fixes beams and then lays and fixes loose plywood sheets. After the pour the deck is taken apart and the pieces are carried up to the next floor. This suits irregular floors with many cut-outs. On a tower with many identical floors it means the same work is repeated again and again, and labour is usually a larger share of formwork cost than the sheets themselves. The slab formwork guide describes the conventional method in more detail.

Table formwork targets that repetition. When the concrete has gained enough strength, the legs of the table are lowered or folded. The table is rolled to the slab edge and the crane lifts it to the next level. The pour cycle then depends on how quickly tables can be struck, flown and set again, rather than on how quickly a crew can rebuild a deck.

What a table form is made of

The top layer is a plywood deck, normally film-faced or overlaid sheet, because the face of the plywood forms the underside of the slab. Below the plywood are closely spaced secondary joists. These rest on stringers or primary beams, and the beams rest on legs. The legs may be adjustable props, truss legs or steel frames, depending on the supplier. Many tables have folding or telescoping legs so that the unit can leave the floor it has just cast. Some tables sit on trolleys for short moves inside the building.

The crane connection is as important as the deck. Tables are lifted through purpose-made lifting points or a lifting frame, with rated chains and tag lines to keep the load balanced. The lifting plan is part of the system design. Many contractors use the words table and flying form for the same equipment, so a specification should name the exact system instead of relying on the label.

Table forms compared with other systems

No single system suits every building. Geometry usually decides the choice. The table below sets out the role of each system so that a package scope does not mix them. Tunnel forms cast walls and slabs together in cellular layouts and are covered in the tunnel formwork guide. Climbing systems move vertical forms up cores and walls, which is a different problem from a floor deck.

SystemBest suited toHow the deck movesPlywood roleWatch-outs
Conventional slab formworkIrregular plans, small floors, many penetrationsBuilt and dismantled piece by pieceLoose sheets on joists, re-cut as neededHigh labour per floor; cut edges wear fast
Table or flying formRegular multi-storey grids with repeating baysWhole deck unit lifted by crane or moved on trolleysFixed deck face on a rigid frameNeeds crane reach, an extraction path at the edge and filler areas
Tunnel formworkCellular layouts of identical roomsRolled out and lifted as a combined wall and slab formFace skin on a steel frameOnly pays off when the layout repeats closely
Climbing formworkCores, shafts and tall wallsRises with the building on rails or by craneWall face on beam or soldier framesVertical work, not a deck system

Where plywood sits in the system

On a table the plywood is a working face fixed to a stiff frame. It must stay flat across the joist spacing, keep its film through repeated pours and survive handling by the crane. The sheets stay fixed to the same joists for many cycles, so the joints and screw lines fall in the same place on every floor. Designers can plan for marks that repeat in this way.

The edges need protection. Raw plywood edges absorb moisture and swell, and a deck that stays in service for many pours benefits from sealed or capped edges. The mill's design basics note covers thickness, span and support spacing. This page stays qualitative. Load tables and temporary-works design belong to the system supplier and the designer, not to the panel order.

Reuse depends on release agent practice, careful striking and careful lifting. The number of pours a face gives varies with the grade, the finish required and the standard of site handling, so no single figure applies to every job.

Planning a table programme

Most planning happens before any plywood is ordered. The crane must reach every bay at the weight of the heaviest table, and the table must clear the floor below as it leaves. Tables normally leave through a gap at the slab edge, so edge protection, perimeter beams and cladding fixings may need to be sequenced around that gap.

Fillers are the next item. Real floors include stairs, lift cores, odd corners and columns that a standard table rectangle does not fit. Conventional formwork closes those areas, and it should be in the budget from the start. Column interfaces need a clear detail showing where the table wraps the column or stops short of it. Tables beside walls usually need a stripping gap, and sometimes a drop-head detail so the deck can lower without catching. The propping under the table is part of the temporary-works design. The walers, soldiers and beams guide explains the beam terms used in the frames.

Striking, lifting and resetting

The cycle for one table has a fixed order. The concrete reaches the strength that the designer has set for striking. The legs are lowered or folded, which frees the deck from the slab soffit. The table is moved to the edge on its trolleys or rollers, and the crane takes the weight through the lifting points before the table leaves the floor. At the next level the table is set down on its legs, adjusted for level and falls, and the edge details are closed before the reinforcement goes in.

Release agent is applied to the plywood face before each pour, and the application should be even and thin. Surplus agent pools on the deck and can mark the slab. The form release agents guide describes the products and their effect on film-faced and overlaid faces. A short inspection of the face, the edges and the lifting points after each move catches damage before the next pour.

Specifying plywood for table decks

A panel buyer working for a table-form supplier or a contractor normally receives a short specification. It states the panel thickness, the sheet size, the type of face, the glue class and the edge treatment. The thickness comes from the joist spacing and the load that the designer has calculated. The face type depends on the finish required on the slab soffit. A grade chosen only on price can fail early on a table deck, because the deck stays in service for a long series of pours and every sheet is fixed to the frame.

Importers and distributors who hear the words table form or flying form on an enquiry can ask three simple questions. Which system will carry the panels? What is the joist spacing? What finish must the soffit have? The answers show whether the project needs a stiff, thicker sheet or a standard one, and whether replacement sheets must match the original deck. Replacement is easier when the deck was planned in standard panel sizes from the start.

Common problems

Deflection is the first problem. If the spacing of joists or stringers is too wide for the load, the deck sags between supports and the slab soffit shows it. The film face does not correct a flexible frame. Joint marks are the second problem. They come from sheet edges that sit proud or from gaps between sheets, and taped or sealed joints with careful setting reduce them.

Handling damage is the third. Tables are knocked at the slab edge by chains, by the crane block and by legs dragged across concrete. Torn film and crushed corners follow a rough move. The last problem is scheduling. If the crane is booked elsewhere the floor cycle stops, so lifting capacity has to be planned from the first day of the frame.

Duties for formwork and shoring, including inspection before and during the pour, are set out in public rules such as the OSHA concrete and masonry standard and in ACI formwork guidance. Both appear in the sources below.

Frequently asked

What is the difference between table formwork and a flying form?

A table form is a pre-assembled deck unit with its own supports. A flying form is a table designed to be lifted out by crane from floor to floor. In practice the two names often describe the same equipment, so check the supplier's description of how the unit moves.

When does table formwork make sense compared with conventional slab forms?

It makes sense when floors repeat across many storeys and the crane can reach every bay. The saving comes from not rebuilding the deck for each pour. On small or irregular floors conventional formwork is usually more flexible.

What kind of plywood is used on a table deck?

Most table decks use film-faced or overlaid plywood fixed to joists, because the face must stay flat and release cleanly over many pours. Thickness depends on joist spacing and load. The system designer sets it, not the panel buyer.

Does plywood need special edge protection on a table form?

Edge sealing is a sensible precaution, because exposed edges absorb moisture and swell. A sealed or capped edge protects the neighbouring face through repeated pours. Follow the panel maker's and the system supplier's instructions for products and coverage.

Who designs and checks a table-form system?

The system supplier and the project's temporary-works designer carry that duty, using the site's load and crane data. Panel suppliers only provide material that meets the specified grade and size. Local rules, such as OSHA in the United States, set inspection and strength-check duties on site.

Related in the atlas

Continue reading

Same topic first, then what others on the atlas read most.